|
|
Products - PPH-D Duct Supports
|
|
|
Encapsulated Duct Support
Goal Post Duct Support |
Installation Procedure |
|
- Scrape off loose gravel, if gravel exists.
- Consult manufacturer of existing or new roofing system
as to type of walk pads required for their roofing system.
- Determine spacing of supports
- Fully adhere walk pads by hot-mopping them to roof
system, if required
- After pads are installed, place bases on pads
- Place pre-assembled support into bases and adjust as
needed. Note, support shall be adjustable to maintain
existing elevation or slope.
|
|
|
|
|
|