|
|
Products - Tele-communications Platforms
 |
|
|
MP-RB18-LA
MP-RB18 Standard
PPH Platform System |
Installation Procedure |
 |
- Lay out walk pads
- Put bases on walk pads
- Insert pre-assembled structures into base.
- Attach grating to substructures.
- Attach intermediate and top handrails, if provided.
|
|
|
|
  |
|
|