Scrape off loose gravel, if gravel exists.
-
Consult manufacturer of existing or new
roofing system as to type of walk pads required for their
roofing system.
-
After pads are installed, place bases on
pads
-
Place frames over pipe to support and insert
in bases
-
Fasten frames to bases with supplied bolt &
nut.
-
With all pipe supports in place, start at
beginning of system and adjust each strut/roller to achieve
a balanced system. The process should be done in stages,
raising the pipe ½" at a time. When desired height is
reached, check each support to determine if and equal amount
of weight is being distributed at each support.
-
Installation per local, provincial or state
Plumbing & Gas Code.
|
|
|
|
|
|
|