Products - Pipe Support Systems
PP10 Installation
Procedure
Scrape off loose gravel, if gravel exists.
Consult manufacturer of existing or new roofing system as to type of walk pads required for their roofing system.
After pads are installed, place pipe supports on pads
With all pipe supports in place, start at beginning of system and adjust each strut/roller to achieve a balanced system.
Installation per local, provincial or state Plumbing & Gas Code.
PP10 with Strut
PP10 with Roller
PP10 with Strut & hanger