|
|
Products - Super Sleeper Series
 |
|
|
Super Sleeper Installation
Procedure |
 |
-
Scrape off loose gravel, if gravel exists.
-
Consult manufacturer of existing or new
roofing system as to type of walk pads required for their
roofing system.
-
After pads are installed, place pipe
supports on pads
-
With all pipe supports in place, start at
beginning of system and adjust each strut/roller to achieve
a balanced system.
-
Installation per local, provincial or state
Plumbing & Gas Code.
|

 |
 |
|
 |
|
 |
Super Sleeper with Channel: SS-8C |
|
Super Sleeper with Roller: SS-8R |
|
Super Sleeper with Roller: SS-8R |
|
|
  |
|
|